Shore-side home's glazed living-room bay, cedar posts, silvered timber terrace, and ferns beside a concrete step.

Edmonds' Waterfront Premium Hasn't Priced In BNSF's Second Track Yet

On a wet night sometime in the last five years, along the stretch where Dayton Street crosses the BNSF tracks in downtown Edmonds, the wayside horn system meant to warn drivers quietly failed again. City workers didn't need to guess why. City Engineer Mike De Lilla has described the pattern as being like a circuit breaker in a house that keeps tripping: you can reset it, but you never really know what caused the trip in the first place. The system has failed often enough since its 2019 installation that the city has spent roughly $19,000 over five years on 125 manual resets, $8,000 of that in 2025 alone. When the quiet horn goes down, the full-volume train horn takes over, right along the half-mile of waterfront where Edmonds charges some of the highest prices in Snohomish County for the privilege of living close enough to walk to the ferry.

That's the detail a buyer touring Edmonds waterfront listings this fall is unlikely to hear from a listing sheet. The soundscape they're pricing in today isn't fixed. BNSF has confirmed plans to lay a second track along that same stretch, a project that would roughly double the line's capacity through the exact corridor that runs past the marina, the ferry terminal and the homes commanding the steepest premiums in the Bowl.

The Premium Is Real, and It's Recent

As of August 2026, the average sale price for an Edmonds home reached $987,000, up 5 percent from a year earlier, with the most competitive listings going pending in about six days and often drawing multiple offers, some with waived contingencies. That pace and price sit well above the surrounding county norm, and the premium concentrates in a handful of blocks: the Bowl, the rise above Sunset Avenue, the streets that put a five-minute walk between a front door and the ferry line. Downtown's arts corridor, the Saturday market, Brackett's Landing and the fishing pier all sit inside that same walkable core, which is a large part of why proximity to it costs more.

Not every corner of that premium is behaving the same way in 2026, though. View and waterfront listings priced above $1.5 million have been sitting for 60 to 90 days this year, the first real stretch of buyer leverage at the top of the Edmonds market since 2020. The properties closest to the water, closest to the tracks and closest to the ferry line, the ones that should be hardest to find and fastest to sell, are the ones taking longest to close. That gap is worth sitting with before treating the waterfront premium as a fixed feature of the market rather than a bet on conditions staying the way they are right now.

Two Miles That Used to Be Double-Tracked Already

The mechanism behind that gap starts with a stretch of rail that is, historically speaking, reverting to form rather than being newly built. Old photographs of the Edmonds waterfront from before 1960 show two tracks running along the shore, plus a siding. At some point the second track was pulled out, leaving a two-mile single-track bottleneck that begins north of Point Wells, wraps around Point Edwards, skirts the Edmonds Marsh, passes the marina and the Waterfront Center, and ties into existing double track at Edmonds Street.

BNSF confirmed in 2021 that it intended to rebuild that second track, initially targeting 2023. As a privately held railroad, BNSF isn't required to disclose engineering details to the city whose streets cross its right of way, and Edmonds' own Public Works and Utilities Director has said for years that the railroad has been unwilling to share drawings even with the city's design consultants. What's confirmed is the intent: restore the second track, and freight, Amtrak Cascades and Sounder commuter service all gain capacity on rails that already pass within a few hundred feet of the Bowl's most expensive real estate.

What Sixty Trains a Day Already Sounds Like

Before that second track adds any capacity, the corridor is already busy. Up to 60 trains cross Dayton Street on a given day, and the horn meant to warn drivers without blasting the whole waterfront has a documented failure pattern that tends to worsen in heavy rain, according to city engineering staff. That reliability problem drew more than 130 residents to a February 2026 Civic Roundtable on the subject, and it was still an open item on the city council's public works committee agenda the following month.

None of that is hypothetical for a buyer walking a listing on Sunset Avenue or Railroad Avenue today. It's the baseline noise environment the current premium already reflects, before a second track adds volume to the same stretch.

Two Doors, and the Project That Would Have Added a Third

The other cost of a single, aging rail corridor is emergency access. Only two street crossings, at Main and at Dayton, connect downtown Edmonds to its own waterfront. When a train stops on the tracks, whether for a mechanical issue or something worse, both crossings can close at once, and the marina, the ferry terminal, the beaches and the homes along Sunset Avenue lose their only vehicle connection to the rest of the city until the train clears. In one widely reported 2016 incident, a fatality on the tracks kept both crossings blocked for nearly three hours.

The project meant to fix this, a multimodal hub known as Edmonds Crossing that would have relocated the ferry terminal and consolidated ferry, bus and rail traffic away from downtown's at-grade crossings, has effectively been shelved. Jurisdiction over the roughly $171 million project passed to Washington State Ferries in 2007, and the agency announced in 2009 that it would leave the project unfunded for twenty years, choosing to direct its limited capital budget toward maintaining its existing vessels instead. Emergency-access proposals studied in the years since, including a one-lane connector linking Sunset Avenue to Brackett's Landing, have drawn their own opposition over cost and environmental impact and remain unresolved. The Edmonds Sounder station itself still runs on a single side platform for the same reason, waiting on the second track before a west platform can even be built.

The corridor's single point of failure isn't going away before the second track adds more train traffic to it.

Reading the Waterfront's Own Numbers

Put the pieces together and the 60-to-90-day pause on view and waterfront listings above $1.5 million starts to read less like a fluke and more like the market doing its own diligence. Buyers with the means to purchase in that tier are also the buyers with the time to ask more questions: which block, how close to Dayton versus Main, what the reset history looks like, whether the second track has an actual construction date yet. Inventory has also been rising across Edmonds through 2026 as owners who held off selling during the low-rate years decide the moment is right, which gives buyers room to ask those questions instead of waiving them in a bidding war.

None of this erases the premium. Edmonds' walkable, ferry-adjacent core is still the fastest-moving, highest-priced segment of the local market, and that isn't likely to change soon. What's changing is how much of that premium a buyer should expect to hold once a second rail line goes in along the same water's edge that makes the location valuable in the first place.

What to Actually Ask Before Writing an Offer Near the Tracks

  • Which crossing is closer, Main Street or Dayton Street, and has that specific block reported horn or reset issues?
  • Is the property inside the roughly two-mile segment BNSF has identified for the second track, between Point Wells and Edmonds Street?
  • Has the seller or listing agent disclosed any history of train-related noise complaints or city response calls at that address?
  • What's the current status of the emergency-access ramp near Brackett's Landing, and does the property sit within the footprint served only by the Main and Dayton crossings?

These aren't disclosures a seller is required to volunteer, so they're worth raising directly with the listing agent or confirming through city planning records before an inspection period closes.

Edmonds hasn't stopped being a place worth a premium. It's a place where the premium and the risk sit on the same two miles of track, and where a buyer who asks about a specific block gets a very different answer than one who only asks about the view. If you're weighing a listing near the Bowl, the marina or anywhere along that rail corridor, The Christophilis Team can walk the specific block with you, pull the reset and complaint history, and help you price the tradeoff before you write the offer.

Work With Us

We pride ourselves in providing personalized solutions that bring our clients closer to their dream properties and enhance their long-term wealth.

Follow Us on Instagram